+86 193 9277 7259 · yuhua0095@gmail.com
China Rebar Machinery China Rebar Machinery

Rebar Arc Bending Machine — Arc Length 2600–5000 mm

The GDWHWQ-36 bends arcs and hooks from rebar: arc length 2600–5000 mm, hook length 150–500 mm, bending angle 0–120°, bending speed 48–62°/s, minimum bending radius 2600 mm. It handles 2 bars of Ø16–Ø28 or 1 bar of Ø32–Ø36 per cycle and measures 9700 × 5000 × 2600 mm. The GWH50CG bends 50 mm bar to R500 or larger.

What an arc bender is for

Arc benders form curved bar for tunnels, domes, round columns and curved beams.

  • The GDWHWQ-36 handles arc lengths from 2600 to 5000 mm and hooks from 150 to 500 mm.
  • Bending angle is 0–120°; speed is 48–62°/s.

Capacity per cycle

Capacity falls as bar size rises.

  • Ø16: 2 bars; Ø20: 2; Ø25: 2; Ø28: 2; Ø32: 1; Ø36: 1.
  • GWH50CG: up to 50 mm bar, R500 or larger, drive wheel 270 mm, 30–43 rpm.

Layout and power

GDWHWQ-36 is a large machine: 9700 × 5000 × 2600 mm.

  • Leave clearance for long bar on both sides.
  • Air pressure 0.6 MPa is required for the bending head.

Price and delivery

Arc benders are quoted per bar range, radius and voltage.

  • Send the radius, arc length and bar size; we confirm the model and FOB price within one business day.
  • MOQ is one machine.

Specifications

ModelGDWHWQ-36GWH50CG
TypeCNC arc & hookArc bender
Max barØ32–Ø36 (1 bar)50 mm
Arc length2600–5000 mmR500 or larger
Hook length150–500 mm—
Bending angle0–120°—
Speed48–62°/s30–43 rpm
Air pressure0.6 MPa—
Dimensions9700 × 5000 × 2600 mm—

FAQ

What is the minimum radius?

2600 mm on the GDWHWQ-36; R500 on the GWH50CG.

How many bars per cycle?

GDWHWQ-36: 2 bars Ø16–Ø28, or 1 bar Ø32–Ø36.

Does it need compressed air?

Yes, 0.6 MPa.

What is the MOQ?

One machine.

Related

Products

More rebar machine buyer guides

Rebar Arc Bending Machine — Arc Length 2600–5000 mm — buyer questions

What is the MOQ for Rebar Arc Bending Machine — Arc Length 2600–5000 mm?

Usually 1 unit ??these are machines, not consumer goods. We can quote a single unit or a full line.

What is the lead time?

Standard machines ship in 7-15 days; custom or production lines take 20-35 days.

Do you provide certification and documents?

Yes ??CE and ISO documentation where applicable, plus commercial invoice, packing list and CO for customs.

How do I get a price?

Send the model and your country on the request-quote form or WhatsApp; we reply with FOB/CIF pricing and shipping options.